Home/Catalogue/CyberPower/C3P11000
Startup Service3Phase 1040kVA
- Service: 5x8 Startup Service for SM 10-40kVA 3-Phase UPS
- Certified Professional: A CyberPower Systems represenative with product setup and operation expertise
- Installation Verification: Startup and operation testing
- Scheduling Coordination: Flexible scheduling to reduce delays
- Documented Service: Details of the startup are recorded to support future operation and maintenance
- Reply within 1 business day
- Volume & business pricing
- Shipping across Canada & US
Overview
Product Overview
The CyberPower Systems Startup Service for SM 10-40kVA 3-Phase UPS is a 5x8 option performed onsite by an authorized service representative to inspect installation, power on, test functionality, and document the 3-Phase UPS is operating correctly.
Flexible Scheduling
5x8 Startup supports a customer's schedule and business requirements
Certified Representatives
A CyberPower Systems service representative with the training and experience will come to you location to inspect the installion, verify setup, power on, and verify a UPS is operating as designed.
System and Site Review
A technician will inspect the system for handling damage, proper installation, ensure the site meets operational and environmental requirements, and is accessible for future maintenance and service requirements.
Installation Safety Check
An inspection will be done to confirm the circuit breakers are properly sized, and verify wiring to and from breakers is correct. The incoming voltages will be measured to ensure they match system specifications and phasing, and phase rotation are correct.
Voltage Check
Confirm the system output voltage, and the output waveform is within the defined specifications.
Bypass Check
Test the bypass functions, static and maintenance, to ensure they operate correctly.
LCD Control Panel
Ensure all the operator control panel functions and readings perform as designed.
System Function Tests and Demonstration
A demonstration of all applicable system operation modes will be completed with the appointed customer representative(s).
Battery Load Test
The technician will remove input power to the UPS to simulate an outage and verify the unit is operating on battery as designed.
System Operator Training
After completion of system the start up service, the service technician will provide basic system operator training for up to four (4) onsite operators.
Startup Service Report
A record of the system's baseline data, servics performed (if any), and the official system start date will be provided to the customer.
Specifications
Features
- Type
- On-site
- Service type
- Onsite Support
- On-site support
- Yes
- Coverage area
- 48 US contiguous states
- Compatibility
- SM 10-40kVA 3-Phase UPS
Downloads
More in PDUs & Line Conditioners
CyberPowerCPS Rackmount PDU 15ACPS1215RM
CyberPower125V/1800J 515R, 6ft cordCPS815RMS
CyberPowerSurge 4 Outlets 6 FT Cord 2 USB AP406U
CyberPower20A Derated to 16A, 208 230 V, 50Hz/60Hz, IEC320 C20 plug, 8 IEC320 C1PDU20BHVIEC8R
CyberPowerSwitched PDU 20A 120V NEMA L520P input 8 NEMA 520R output 12ft cord 1UPDU41002
CyberPower750VA/750W, Pure Sine Wave, NEMA 515P, 5 ft cord, 6 NEMA 515R, USB, SePR750LCD3C
CyberPowerCyberpower UPS Preplacement Battery, 2 X 6V/8AH Batteries, 18MONTH WTYRB0690X2A
CyberPowerReplacement Battery 12x12V/6AHRB1260X12